Gallery
Images are property of Poly-Tech. All rights reserved. No authorization to use, copy or reproduction for the images is given.
-
Linemarking Before & After
Restriction lines, safety crossings and walkways can all be marked out with an expert attention to your layout drawings.
-
Flinders University - Mechanical Abrasion
During the design stage of the new science building at Adelaide’s Flinders University, budgetary restraints resulted in the project having to be scaled back, consequently a previously covered walk way was left exposed to the elements. The original tiles selected for the project did not meet the minimum slip resistance of the Australian Standards based on AS/NZS 4586. Following hand over of this award winning building it became apparent that the need for some form of non slip treatment was urgently required to meet OH&S standards. Given the emphasis placed on the aetsthes of the building it was necessary to find a solution which met the needs of all parties.
-
City Mazda - Roller applied epoxy with epoxy line marking
-
City Mazda - Roller applied epoxy with epoxy line marking
-
Clipsal Self Levelling Screed & Epoxy Line Marking
-
Clipsal Self Levelling Screed & Epoxy Line Marking
Clipsal; an industry leader in electrical accessories, data communications, industrial and home electrics employing for over 1,500 people Australia wide had outgrown their existing premises at Brompton. The $50m move to a larger factory at Gepps Cross was Clipsal’s ideal opportunity to design a flooring system around their manufacturing needs.
-
Clipsal Epoxy Line Marking
The entire project was complimented by instillation of epoxy line marking of all areas for safety zones, roadways and production areas ensuring that client would have no need to revisit their flooring requirements for many years to come as well as meeting stringent occupational health and safety regulations of today.
-
Clipsal Epoxy Line Marking
Given this new premises was already up and running the work to be completed had to be carried out without any closure to the manufacturing works. This required strategic planning and such was that the preparation must be carried out without any disruption to the workforce; Poly-Tech’s solution to this was dustless diamond grinding. In consolation with the client and the builder, Poly-Tech was to design a specification for their various production, roadways and walk way areas etc that must culminate in specification that met all requirements keeping within tight budget requirements.
-
Tusmore Park Wading Pool - a great success!
The new covering of fibreglass is structurally strong, has a waterproof barrier, prevents and covers unsightly surface cracks and reduces water loss through leaks. It is quick to install, has an ease of maintenance and coated with a non slip gel coat that resists algae growth.
Aesthetically the Tusmore Park wading pool has been instantly improved. The all important environmental issues of water leakage solved, and the health and safety of the children assured. -
Tusmore Park Wading Pool Before & After
When Poly-Tech Industrial Services came to inspect the pool, the concrete substrate was pitted and cracked and the existing coating has failed which can lead to algae imbedding itself into pores and crevices where it can harbour and foster bacterial growth.
-
Tusmore Park Wading Pool - Application of fibreglass
Firstly the total removal of the previous coating and the grinding of the concrete was in order to ensure 100 percent adhesion of the new system. Remedial repairs were needed to remove drummy concrete, grinding back the reinforcing steel to remove rust, treat with anti-corrosives and make good the render to restore the original facade.
-
-
-
Phoenix - Self Levelling
Self levelling epoxy flooring is a seamless, low maintenance system and is recommended for floors where a high level of aesthetics are required
-
Peter Davey Toyota - Epoxy Floor
